Vol 25 No 3 (2019)
Published: 2019-03-01
Articles
The cost performance and causes of overruns in infrastructure development projects in Asia
Abstract 4006 | PDF Downloads 2728 | DOI https://doi.org/10.3846/jcem.2019.8646
Page 203-214
An investigation into working behavior characteristics of parabolic CFST arches applying structural stressing state theory
Abstract 1293 | PDF Downloads 795 | DOI https://doi.org/10.3846/jcem.2019.8102
Page 215-227
Patent cooperative patterns and development trends of Chinese construction enterprises: A network analysis
Abstract 1957 | PDF Downloads 1059 | DOI https://doi.org/10.3846/jcem.2019.8137
Page 228-240
Solving construction project selection problem by a new uncertain weighting and ranking based on compromise solution with linear assignment approach
Abstract 2187 | PDF Downloads 1091 | DOI https://doi.org/10.3846/jcem.2019.8656
Page 241-251
Why conflicts occur in roads and tunnels projects in Norway
Abstract 1798 | PDF Downloads 1091 | DOI https://doi.org/10.3846/jcem.2019.8566
Page 252-264
Concession model for fair distribution of benefits and risks in build-operate-transfer road projects
Abstract 1546 | PDF Downloads 993 | DOI https://doi.org/10.3846/jcem.2019.8649
Page 265-275
Project external environmental factors affecting project delivery systems selection
Abstract 2106 | PDF Downloads 4679 | DOI https://doi.org/10.3846/jcem.2019.7460
Page 276-286
Behaviour of vertical cylindrical tank with local wall imperfections
Abstract 1004 | PDF Downloads 663 | DOI https://doi.org/10.3846/jcem.2019.9629
Page 287-296